Uncategorized
A deposit will be required on new accounts. To waive a Member Deposit (Residential applicants only), new member(s) will have a “soft” credit check run on those listed on the Application; the deposit will be waived; otherwise, a deposit will be required.
If a current member is applying for additional service, a payment history of the last 24 months with the cooperative will serve to establish a satisfactory credit; if it does not, then a deposit will be required.
Location with History of usage – 1/6 Annual Billing for Residential/Commercial or minimum deposit amount, whichever one is greater.
Minimum Deposit Amount for Location with out History of usage:
- Commercial = $500
- Residential = $300
Return of Deposit
All deposits are credited to the active account after 24 consecutive billings (with no discontinuation of service due to non-payment or delinquent more than 2 times) or are applied against outstanding bills upon disconnection of electric service or refunded.
If you have any questions regarding your Member Deposit, you may contact our Member Service Deposit at (903) 683-2248 or (800) 992-4280. Office hours are from 8 a.m. to 5 p.m. Monday through Friday.
Major energy-consuming appliances include refrigerators, freezers, ranges and ovens, air conditioners, clothes dryers, washing machines, furnaces, and dishwashers. Smaller energy users include clocks, irons, toasters, and a whole range of kitchen and bathroom aids. Below is a breakdown of the most common appliances and their estimated energy requirement.
| Electric Product | Estimated kWh per month |
|---|---|
| Food Preparation & Preservation: | |
| Coffee Maker | 9 kilowatt-hours (kWh) |
| Dish Washer | 30 kWh |
| Frying Pan | 8 kWh |
| Microwave Oven | 16 kWh |
| Range with Oven | 58 kWh |
| Slow Cooker | 12 kWh |
| Toaster | 3 kWh |
| Waffle Iron | 2 kWh |
| Refrigerator (12 cubic feet) manual | 78 kWh |
| Housewares: | |
| Sewing Machine | 1 kWh |
| Vacuum Cleaner | 4 kWh |
| Electric Blanket | 12 kWh |
| Ceiling Fan | 12 kWh |
| Circulating Fan | 4 kWh |
| Water Heating & Supply | 27 kWh |
| Pool Pump (3/4 horsepower) | 375 kWh |
| Sprinkler System (1 1/2 horsepower) | 28 kWh |
| Trash Compactor | 4 kWh |
| Health & Beauty: | |
| Refrigerator/Freezer 12 to 14 cubic feet (manual) | 125 kWh |
| Refrigerator/Freezer 14 to 17 cubic feet (frost-free) | 170 kWh |
| Heating Pad | 1 kWh |
| Refrigerator/Freezer 17 to 20 cubic feet (frost-free) | 205 kWh |
| Freezer 14 1/2 to 17 1/2 cubic feet (manual) | 135 kWh |
| Freezer 14 1/2 to 17 1/2 cubic feet (frost-free) | 188 kWh |
| Hair Dryer | 2 kWh |
| Curling Iron, shaver, toothbrush | each less than 0.5 kWh |
| Lighting | |
| 4 to 5 rooms | 50 kWh |
| 6 to 8 rooms | 60 kWh |
| Outdoors, 1 spotlight, all night | 45 kWh |
| Home Entertainment | |
| Radio | 7 kWh |
| Radio/Record/Tape Player | 9 kWh |
| Television (Tube-type - black & white) | 18 kWh |
| Television (Solid State - black & white) | 8 kWh |
| Television (Tube-type - color) | 44 kWh |
| Television (Solid State - color) | 27 kWh |
| Comfort Conditioning | |
| Central System, 2 ton | 1450 kWh |
Notes:
- The central system for comfort conditioning assumes the compressor is continuously thermostat-controlled and operates 55% of the time during the hottest months. (EER-energy efficient ratio)
- The kWh usage shown is for the constant operation of the compressor for 1 hour. When the unit is operated full-time on a daily basis, subject to thermostat control, the compressor may cycle off up to 40%, and the hourly average cost would be lower.
- Each dishwasher load uses about 2.5 kWh for hot water. Each washing machine load uses about 5 kWh for a hot wash per hot rinse cycle and about 1 kWh for a warm wash or cold rinse cycle.
- Energy consumption is measured in kilowatt hours (kWh), the units of energy that flow through your electric meter.
It is the intent and goal of Cherokee County Electric Cooperative Association to perform right-of-way tree trimming maintenance on the entire distribution system on a 5-year continuous cycle. Herbicide application is used as part of the maintenance of the right-of-way (ROW), as needed on selected areas determined by management. Policies and common practices dealing with routine right-of-way maintenance are summarized below.
The standard width for distribution right-of-way is 30 feet (15 feet on either side of the centerline) for overhead line and 10 feet for underground. The same widths apply for service wire; however, maintenance of service right-of-ways remains the responsibility of the member/land owner. The Cooperative will disconnect and remove the line when requested and needed (as determined by the Cooperative) in order for the member or his representative to cut and/or trim the service right-of-way.
Clean-up of debris associated with tree trimming will be handled and determined as required on a case-by-case basis. The general practice is to clean up areas such as yards, pastures, and right-of-way that are being mowed and maintained by the property owner. Wooded areas, underbrush, and areas not being maintained by the owner will be left to decompose. Along fence rows, limbs too large to mow over will be stacked along the fence.
For questions regarding ROW, please contact Scott Creech at (903) 683-2248 extension 3088 or email Scott Creech.
Whether you're new to Cherokee County Electric Cooperative Association (CCECA) or an existing member, it's easy to turn on the power. There are 4 simple ways to start the process:
For more information, email CCECA, or call (903) 683-2248, or (800) 992-4280 (toll-free), or fax: (903) 683-5012.
- Download and fill out the Service Request Form (Load Sheet)
- Individual: Fill out an online application or print out and submit an Application for Membership and Agreement
- Business: Fill out an online application or print out and submit an Application for Membership and Agreement
- Provide a copy of your driver’s license
- Pay the $25 connect fee and any applicable member deposit
- Copy of Rental/Lease Agreement, if applicable, or provide a copy of the signed and notarized Warranty Deed or Deed of Trust
- Provide the existing Meter Number, if available
- For service at a location that does not already have a meter pole and loop, CCECA will provide you with the necessary meter loop specifications
- For a detailed checklist to become a CCECA member, download our New Service Check List.
Once you’ve completed the steps above, please allow up to 7 business days if no line extension or new facilities are required. This may take longer during inclement weather.
When you’re new to CCECA, it’s easy to turn on the power. There are 4 simple ways to start the process:
For more information, email CCECA, or call (903) 683-2248, or (800) 992-4280 (toll-free), or fax: (903) 683-5012.
The process involves several steps, so be sure to contact CCECA as soon as possible to allow time for power line design and construction. Here's what you'll need and how it works:
- Fill out the following forms:
- Individual: Fill out an online application or print out and submit an Application for Membership and Agreement
- Business: Fill out an online application or print out and submit an Application for Membership and Agreement
- Include a copy of your Driver’s license. Pay $25 connect fee and any applicable member deposit.
- Provide a copy of a signed and notarized Warranty Deed or Deed of Trust
- Obtain the 911 address from your county, if needed
- The Staking Technician will contact you to schedule a staking appointment
- Meet at your property with a CCECA Staking Technician who will determine the requirements and your costs
- Complete any required easements
- Fill out and submit an Underground Utility Agreement
- Pay construction costs
- Notify CCECA when the meter loop is installed, and the right-of-way is cleared
Once you’ve completed the steps above, we’ll schedule construction on your property. Please allow 90 days for the construction to be complete. This may take longer during inclement weather.
For service at a new location, CCECA will provide you with the necessary meter loop specifications.
For a detailed checklist to becoming a CCECA member, download our New Service Check List.