Yes. An application fee is required to be Interconnected. The application fee for a Class I Facility is $25 and the application fee for a Class II Facility is $100. Additionally, after Interconnection, the member will be charged a monthly metering fee. The metering fee for a Class I Facility is $15. The metering fee for a Class II Facility is $50.